Join us for the LA-Inyo Technical Group this Tuesday, 11/24, at 9am. The most significant topic at this meeting is the approval of turning on a “replacement” groundwater-pumping well near Independence. However, this new well is far deeper than the one it was “replacing,” and vegetation nearby has already been struggling. We don’t yet know the impacts of a pumping from deeper aquifers.
Let’s tell LADWP that we would like to see environmental assessment of this deeper well before they turn it on!
In-person:
Room 100 in Clint Quilter County Office Building
1360 N Main St., Bishop, CA
Meeting ID: 251 157 016 380 099 2
Passcode: 8vH2k8H9
Technical staff from the Inyo County Water Department and the Los Angeles Department of Water and Power (LADWP) will discuss 3 things:
Updates about Eastern Sierra runoff and recent LADWP operations
Approval of the final Bishop Cone Audit for the 2025-26 runoff year
Action item: Approve turning on Well 427, drilled and equipped as a replacement for Well 061. This includes these administrative actions:
Replace W061 with W427 on Exempt Well List
Update Tables 1.3, 1.5, and 2.1 in LADWP Annual Owens Valley Report to reflect new well